A section of the old Belleair Bridge was demolished on July 15th as construction continued into the next phase on the newer, bigger and better Belleair Beach Causeway Bridge.
The Belleair Beach Causeway Bridge connects the Pinellas County Mainland Peninsula to the Barrier Islands, from Belleair Bluffs to Sand Key and Belleair Shore. The former structure was built in 1950, with an expected life span of fifty years. In the 21st century, the design had become obsolete and was too expensive to maintain so a new bridge was built.